1
|
Rani-Jhansi Park at Ridge.
|
Rs. 0.55
|
|
2
|
Park at Gol Pahadi near Annadale.
|
Rs. 1.09
|
|
3
|
Face lifting of existing parks Below Ashianaat Ridge.
|
Rs. 0.26
|
|
4
|
Development of parks and open spaces in different wards.
|
Rs. 2.09
|
|
5
|
Face lifting of existing parks near Lift.
|
Rs. 0.43
|
|
6
|
Reconstruction and improvement of pedestrian path on KSC road.
|
Rs. 0.92
|
|
7
|
Reconstruction of W. beam Railings. (RDs 145/100 to 149/000. )
|
Rs. 1.32
|
|
8
|
Improvement of pedestrian path on Circular road. (RD 152/500 to 148/640.)
|
Rs. 3.83
|
|
9
|
Improvement of pedestrian path and W. metal beam crash barrier railings on MRR via Chotta Shimla.
|
Rs. 1.98
|
|
10
|
Construction of footpath, covered drain, paver block and safety railings on KSC/ MRR road.
|
Rs. 2.12
|
|
11
|
Construction of Smart pedestrian path.
|
Rs. 0.58
|
|
12
|
Providing drain etc. from Dhalli tunnel to Mashobra junction
|
Rs. 2.13
|
|
13
|
C/O addl. Pedestrian path, P/F W. beam metal crash barriers railings.
|
Rs. 2.07
|
|
14
|
Relocation of Kamna Devi Temple Road .
|
Rs. 4.94
|
|
15
|
Reconstruction of Shopping Complex.
|
Rs. 1.39
|
|
16
|
Improvement of Y-junction at Dhalli Tunnel.
|
Rs. 2.21
|
|
17
|
Providing drain etc. from Dhalli tunnel to Mashobra
|
Rs. 2.04
|
|
18
|
Providing drain etc. from Dhalli tunnel to Mashobra junction. RD 153/725 to 153/785 and 154/310 to 154/361.
|
Rs. 2.09
|
|
19
|
Providing drain etc. from Dhalli tunnel to Mashobra junction- 153/765 to 154/500.
|
Rs. 2.25
|
|
20
|
Provision of Breast wall and other protection work.
|
Rs. 2.09
|
|
21
|
C/I on circular road in Shimla town. (RDs 150/290 to 150/380)
|
Rs. 2.18
|
|
22
|
Widening of Road from MLA crossing to Tawi more.
|
Rs. 0.93
|
|
23
|
Metalling/Tarring in various locations.
|
Rs. 1.35
|
|
24
|
Construction of Breast wall and Protection work .
|
Rs. 0.96
|
|
25
|
Improvement of Shimla Mandi Road portion RDs 6/0 to 11/0.
|
Rs. 4.08
|
|
26
|
Widening of circular road and Protection work near Subzi Mandi
|
Rs. 0.91
|
|
27
|
Construction/Improvement road from Brock Hurst to Vikasnagar.
|
Rs. 0.97
|
|
28
|
Widening of road ahead of Kasumpti Bazar towards Panthaghatti.
|
Rs. 1.37
|
|
29
|
Construction/Improvement on circular road in Shimla town (near Ranjan Hotel)
|
Rs. 1.32
|
|
30
|
Improvement of junction at Bemloe Chowk .
|
Rs. 1.22
|
|
31
|
Provision of vending area at Khalini.
|
Rs. 0.18
|
|
32
|
Development of a parking complex near the new block of IGMC.
|
Rs. 2.02
|
|
33
|
Development of smart parking's in wards as per availability of land.
|
Rs. 6.66
|
|
34
|
Construction of Multi-storey parking complex at Vikas Nagar.
|
Rs. 3.27
|
|
35
|
Construction of parking at Circuit house Willy park from cart road near RTO.
|
Rs. 0.59
|
|
36
|
Construction of parking near Raj Bhawan HPPWD Sub-Division.
|
Rs. 1.14
|
|
37
|
Construction of Off street parking near Sankat Mochan.
|
Rs. 5.00
|
|
38
|
Development of Book Café at Chaura Maidan.
|
Rs. 0.78
|
|
39
|
Development of Book Café at Sanjauli.
|
Rs. 0.40
|
|
40
|
Refurbishment of shops at SubziMandi (pocket-1) 65 shops and 13 stores.
|
Rs. 2.83
|
|
41
|
Refurbishment of shops at SubziMandi (Pocket-2) 28 shops and 3 stores.
|
Rs. 1.10
|
|
42
|
Refurbishment of shops at Lower Bazar (39 No. shops and 15 No. basements)
|
Rs. 2.80
|
|
43
|
Refurbishment of shops at Ram Bazar (40 shops)
|
Rs. 2.02
|
|
44
|
Refurbishment of 4 Residential Blocks (36 flats) at Ghora Line Krishna Nagar.
|
Rs. 9.19
|
|
45
|
Unsafe/dilapidated building at Near Tibetan School, Chotta Shimla.
|
Rs. 1.47
|
|
46
|
Unsafe/dilapidated building at Ghora Hospital, Cart road, Shimla.
|
Rs. 1.25
|
|
47
|
Installation of escalators at Jakhu temple.
|
Rs. 7.94
|
|
48
|
Installation of lift at MC Old Bakery Building.
|
Rs. 2.17
|
|
49
|
Installation of lifts & escalators from Lakkar bazaar bus stand to Ridge.
|
Rs. 1.37
|
|
50
|
Construction of lifts/ Escalators -Police Chowki Lakkar Bazar to Auckland.
|
Rs. 5.33
|
|
51
|
Foot over Bridge at Vikas Nagar.
|
Rs. 3.00
|
|
52
|
Foot over Bridge near Lift.
|
Rs. 4.99
|
|
53
|
Foot over Bridge near DDU Hospital.
|
Rs. 0.74
|
|
54
|
Foot Over Bridge at Chalaunthi Chowk.
|
Rs. 4.33
|
|
55
|
Foot Bridge near Kennedy Chowk connecting to Vidhan Sabha Shimla.
|
Rs. 0.51
|
|
56
|
Construction of covered footpath along Sanjauli-IGMC road.
|
Rs. 4.83
|
|
57
|
Construction of Subway at Himland Hotel on MRR via Chotta Shimla.
|
Rs. 0.46
|
|
58
|
Smart bus stop at Talland- valley side. (Type-B)(RDs 151/095)
|
Rs. 1.61
|
|
59
|
Construction of Rain Shelter at Vikasnagar bus stop and pedestrian path.
|
Rs. 0.32
|
|
60
|
Smart bus stop at different locations in Shimla City.
|
Rs. 2.34
|
|
61
|
Booth for traffic police & LED traffic lights, high mast lights and signages at different locations.
|
Rs. 3.00
|
|
62
|
Construction of RCC water storage tank at near Dhalli (10.00 MLD)
|
Rs. 7.50
|
|
63
|
Construction of RCC water storage tank at near Hotel Peter Hoff (7.0 MLD).
|
Rs. 7.50
|
|
64
|
Initiatives for Govt. High School Krishna Nagar.
|
Rs. 5.31
|
|
65
|
Coverage of Shimla city under CCTV surveillance.
|
Rs. 0.50
|
|
66
|
Implementation of Smart Metering in Shimla Town.
|
Rs. 10.00
|
|
67
|
Construction of tunnel parallel to Dhalli tunnel.
|
Rs. 48.00
|
|
68
|
Channelization of nallah at Combermere Krishna Nagar.
|
Rs. 10.00
|
|
69
|
Replacement of Old fire hydrants at various locations in Shimla City.
|
Rs. 0.34
|
|
70
|
Covered Garbage vehicles (5 cum capacity)
|
Rs. 5.45
|
|
71
|
Regarding procurement of 4 Nos.(14 cum capacity).
|
Rs. 2.50
|
|
72
|
Improvement of approach road from Mall road to Peterhoff Shimla
|
Rs. 0.64
|
|